Transformer stations for charging hubs & e-mobility

HPC charging hubs need a lot of power in a small footprint. We deliver the medium-voltage grid connection – optionally with buffer storage to cut expensive grid-reinforcement costs.

Consumption up to 3,150 kVA HPC-ready optional BESS buffer VDE-AR-N 4110 SF6-free
Built for charging infrastructure

Connection power that still holds at full build-out

Every HPC point draws load. We size transformer and switchgear so your charging hub does not buckle even under simultaneous charging.

01

High simultaneous power

Transformer sized to the charging-hub load profile, including reserve for expansion.

02

Cut grid costs

An optional BESS buffer shaves peak load and reduces grid reinforcement and connection charges.

03

Ready fast

Turnkey compact station, under 10 m², no building permit required in Germany.

Matching stations

Matching stations for charging infrastructure

Compact transformer station

Consumption from the medium-voltage grid, stepped down to the charging-hub low voltage.

up to 3,150 kVASF6-free< 10 m²

BESS transformer station

With integrated battery storage as a load buffer – reduces connection power and grid costs.

bidirectionalpower-plant controllerpeak shaving

Transfer station

Handover point to the public grid with instrument metering and protection.

10–30 kVinstrument meteringutility approval
How the connection works

From the medium-voltage grid to the charger

The grid connection runs via the transfer station at the grid connection point. The transformer converts the medium voltage to the low-voltage level of the charging hub (usually 400 V).

At high simultaneity a buffer storage pays off: it covers load peaks from the battery, so the connection power the grid operator must provide – and thus the connection charge – drops.

Typical sizing guide

Charging-hub powerTransformer (guide)Recommendation
up to 400 kW400 kVACompact station
up to 800 kW800 kVACompact station
up to 1,600 kW1,600 kVACompact + storage
up to 2,500 kW2,500 kVACompact + transfer
> 2,500 kWmultiple unitsHub + transfer station

Guide values – the exact sizing is determined by the configurator or our engineering team.

FAQ

Charging-hub grid connection – in brief

As a guide, the sum of the charge points times a simultaneity factor. A hub with 8×150 kW HPC lands at around 800–1,200 kVA depending on simultaneity. We size it precisely.

Often yes: the storage shaves peaks, lowers the required connection power and thus the connection charge – and buffers weak grid connections.

The medium-voltage connection follows VDE-AR-N 4110 and the grid operator's TAB. With feed-back (BESS) a power-plant controller is also required.

Compact stations under 10 m² require no permit in any German state. International sites we check separately.

Size your charging-hub station in 30 seconds

Enter charging power – get a sizing guide including PDF instantly.